The following preparations shall be completed before using an electromagnetic chuck to guarantee normal performance and safe operation:

Power supply check: Verify that the connected power supply is stable and compliant. Check whether the supply voltage matches the rated voltage of the electromagnetic chuck and confirm the power cable is intact.
Surface cleaning: The chuck surface must be clean and free of oil stains and debris before use. This improves contact between the chuck and workpiece for better magnetic holding force.
Workpiece inspection: Confirm the workpiece is ferromagnetic with a flat surface free of rust and grease, as these conditions directly affect the holding performance.
Magnetic pole gap adjustment: Adjust the magnetic pole gap according to the thickness and shape of the workpiece. A proper gap ensures sufficient magnetic force and prevents workpiece damage.
Connection check: Inspect the connecting parts between the electromagnetic chuck and control system, such as cables and plugs, to ensure they are intact and firmly connected and prevent loosening or disconnection during operation.
Trial run: Carry out a trial operation before formal use. Energize the chuck and check for normal operation, abnormal noise or overheating.
Safety measures: Follow relevant safety operating procedures. Wear insulated gloves and use insulated tools to avoid electric shock hazards.
Working environment check: Make sure the working environment meets requirements. Avoid operation in harsh conditions such as high humidity, high temperature and strong external magnetic fields, which may impair performance and safety.

These preparations help achieve stable and safe operation, higher working efficiency and better product quality.